Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse
Code Project
  1. Home
  2. Other Discussions
  3. Buzzword Bingo
  4. What percentage?

What percentage?

Scheduled Pinned Locked Moved Buzzword Bingo
question
22 Posts 13 Posters 0 Views 1 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • D Douglas Troy

    My projects always get to 99% really quickly, and then the last 1% takes months ... :-\


    :..::. Douglas H. Troy ::..
    Bad Astronomy |VCF|wxWidgets|WTL

    E Offline
    E Offline
    Expert Coming
    wrote on last edited by
    #10

    Even though that was a joke, I would have to say that is pretty accurate. I never consider a project 'done'. I consider is ready for public use, or a release. There will almost always be more that needs or could be done.

    The best way to accelerate a Macintosh is at 9.8m/sec² - Marcus Dolengo

    1 Reply Last reply
    0
    • D Douglas Troy

      My projects always get to 99% really quickly, and then the last 1% takes months ... :-\


      :..::. Douglas H. Troy ::..
      Bad Astronomy |VCF|wxWidgets|WTL

      P Offline
      P Offline
      Pete OHanlon
      wrote on last edited by
      #11

      Douglas Troy wrote:

      My projects always get to 99% really quickly, and then the last 1% takes months ...

      Ah the Microsoft Download project where the project line tends to infinity.

      Deja View - the feeling that you've seen this post before.

      My blog | My articles

      1 Reply Last reply
      0
      • D Douglas Troy

        My projects always get to 99% really quickly, and then the last 1% takes months ... :-\


        :..::. Douglas H. Troy ::..
        Bad Astronomy |VCF|wxWidgets|WTL

        C Offline
        C Offline
        Chris Meech
        wrote on last edited by
        #12

        That's just like the 80/20 rule. It takes 80% of the projected time to complete the first 20% of a project and then takes another 80% of the projected time to complete the last 80% of the project. :)

        Chris Meech I am Canadian. [heard in a local bar] Donate to help Conquer Cancer[^]

        D B 2 Replies Last reply
        0
        • C Chris Meech

          That's just like the 80/20 rule. It takes 80% of the projected time to complete the first 20% of a project and then takes another 80% of the projected time to complete the last 80% of the project. :)

          Chris Meech I am Canadian. [heard in a local bar] Donate to help Conquer Cancer[^]

          D Offline
          D Offline
          Dan Neely
          wrote on last edited by
          #13

          I always saw that stated in reverse. It takes 80% of the time to finish the first 80% of the project, and then in takes 80% of the time to finish the last 20%.

          Otherwise [Microsoft is] toast in the long term no matter how much money they've got. They would be already if the Linux community didn't have it's head so firmly up it's own command line buffer that it looks like taking 15 years to find the desktop. -- Matthew Faithfull

          P 1 Reply Last reply
          0
          • D Dan Neely

            I always saw that stated in reverse. It takes 80% of the time to finish the first 80% of the project, and then in takes 80% of the time to finish the last 20%.

            Otherwise [Microsoft is] toast in the long term no matter how much money they've got. They would be already if the Linux community didn't have it's head so firmly up it's own command line buffer that it looks like taking 15 years to find the desktop. -- Matthew Faithfull

            P Offline
            P Offline
            Pete OHanlon
            wrote on last edited by
            #14

            That's the beauty of the 80/20 rule; it can mean whatever you want it to mean.

            Deja View - the feeling that you've seen this post before.

            My blog | My articles

            1 Reply Last reply
            0
            • G GuyThiebaut

              Occasionally I get asked what percentage of a project I have completed. My reply once was "83 percent" Really unhelpful suggestions for other replies welcomed...

              You always pass failure on the way to success.
              Z Offline
              Z Offline
              zgonja
              wrote on last edited by
              #15

              Nonononono! The catch is that the total number of cents is not based on 100 cents as the name suggests. It's rather based on a variable number usually several times higher. Now, when your boss asks you how the project's goin' you should always smile:cool: and say well, I've completed XX% where XX is >> 50. And as you approach 100, the newly arrived issues will add to the total number of cents, thus increasing total over the suggested name. The important thing is to keep smiling, looking cool and in control, optimistic above all, lookin' good boss, lookin' good!

              1 Reply Last reply
              0
              • G GuyThiebaut

                Occasionally I get asked what percentage of a project I have completed. My reply once was "83 percent" Really unhelpful suggestions for other replies welcomed...

                You always pass failure on the way to success.
                G Offline
                G Offline
                Grimolfr
                wrote on last edited by
                #16

                GuyThiebaut wrote:

                what percentage of a project

                I sometimes respond with "42", just to see if they even get the reference.

                Grim (aka Toby) MCDBA, MCSD, MCP+SB SELECT * FROM users WHERE clue IS NOT NULL (0 row(s) affected)

                G 1 Reply Last reply
                0
                • G Grimolfr

                  GuyThiebaut wrote:

                  what percentage of a project

                  I sometimes respond with "42", just to see if they even get the reference.

                  Grim (aka Toby) MCDBA, MCSD, MCP+SB SELECT * FROM users WHERE clue IS NOT NULL (0 row(s) affected)

                  G Offline
                  G Offline
                  GuyThiebaut
                  wrote on last edited by
                  #17

                  Do you say "42" while nibbling on a biscuit and twitching your nose?

                  You always pass failure on the way to success.
                  1 Reply Last reply
                  0
                  • C Chris Meech

                    That's just like the 80/20 rule. It takes 80% of the projected time to complete the first 20% of a project and then takes another 80% of the projected time to complete the last 80% of the project. :)

                    Chris Meech I am Canadian. [heard in a local bar] Donate to help Conquer Cancer[^]

                    B Offline
                    B Offline
                    Bofs
                    wrote on last edited by
                    #18

                    I've actually had a similar and very Dilbert-like experience in real life. During one of my previous jobs I was assigned to a project the boss claimed was "90% complete" and expected me to finish it in a little over a week. (This implying that it had already been worked on for at least nine weeks by a previous developer who was then reassigned to a different project.) During that one week however it became clear that there was something seriously wrong with the given estimate. I ended up having to explain to the boss that although perhaps 90% of the required functionality had been implemented, it was actually that "90%" of every project that only takes about 10% of the actual work to implement (or auto-generate with some tool!), and the remaining "10%" (the parts requiring some actual effort!) would in reality take a lot more than just one week! To make things worse, what had been built already was actually just a .NET replica of a previous system from a different platform, with a 100% correspondence in specs. Which ofcourse just amounts to an unneccesary re-invention of the wheel, is likely to be costly and will probably just introduce new bugs! The whole thing had obviously been grossly underestimated from the onset, and the implementation/port had been tossed of in such a hurry that it was riddled with obvious defects. Subsequently the client was called in for a spec-review meeting, where said boss didn't even show up in person, leaving me alone to explain this mess somehow to the client. After the meeting it finally dawned on me where the heck that ghastly "90%" figure had come from, it was in fact the relative size of the requirements gap! Later discussion with my boss reluctantly revealed him as having totally underestimated the client's expectations, that the project was already way over budget even before it was assigned to me, and then told me to "just find a way to fix it ASAP!". I was of course outraged and pointed out how utterly unreasonable that was, and after several weeks of fingerpointing and me hopelessly trying to come up with a silver-bullet to rescue the project, the stupid boss still had the nerve to fire me for not succeeding! Not only was I completely run over by this fool, but the treatment I recieved was also a multiple-violation of worker legislation. Fortunately for me it didn't take long to find a new (and much better!) job, and I wasn't at all surprised recently when I found out that the previous company is now out of business and has been filed for bankruptcy

                    G 1 Reply Last reply
                    0
                    • G GuyThiebaut

                      Occasionally I get asked what percentage of a project I have completed. My reply once was "83 percent" Really unhelpful suggestions for other replies welcomed...

                      You always pass failure on the way to success.
                      P Offline
                      P Offline
                      PIEBALDconsult
                      wrote on last edited by
                      #19

                      Hmmm... Let x be the amount of work done. Let y be the total amount of work required. Assume y is effectively infinite. x / y ˜ 0 (The same reasoning that Douglas Adams used to prove that the universe in uninhabited.) Rats, the "approximately equal to" sign didn't come out right. :(

                      modified on Wednesday, April 16, 2008 3:33 PM

                      G 1 Reply Last reply
                      0
                      • P PIEBALDconsult

                        Hmmm... Let x be the amount of work done. Let y be the total amount of work required. Assume y is effectively infinite. x / y ˜ 0 (The same reasoning that Douglas Adams used to prove that the universe in uninhabited.) Rats, the "approximately equal to" sign didn't come out right. :(

                        modified on Wednesday, April 16, 2008 3:33 PM

                        G Offline
                        G Offline
                        GuyThiebaut
                        wrote on last edited by
                        #20

                        :laugh:

                        Continuous effort - not strength or intelligence - is the key to unlocking our potential.(Winston Churchill)
                        1 Reply Last reply
                        0
                        • B Bofs

                          I've actually had a similar and very Dilbert-like experience in real life. During one of my previous jobs I was assigned to a project the boss claimed was "90% complete" and expected me to finish it in a little over a week. (This implying that it had already been worked on for at least nine weeks by a previous developer who was then reassigned to a different project.) During that one week however it became clear that there was something seriously wrong with the given estimate. I ended up having to explain to the boss that although perhaps 90% of the required functionality had been implemented, it was actually that "90%" of every project that only takes about 10% of the actual work to implement (or auto-generate with some tool!), and the remaining "10%" (the parts requiring some actual effort!) would in reality take a lot more than just one week! To make things worse, what had been built already was actually just a .NET replica of a previous system from a different platform, with a 100% correspondence in specs. Which ofcourse just amounts to an unneccesary re-invention of the wheel, is likely to be costly and will probably just introduce new bugs! The whole thing had obviously been grossly underestimated from the onset, and the implementation/port had been tossed of in such a hurry that it was riddled with obvious defects. Subsequently the client was called in for a spec-review meeting, where said boss didn't even show up in person, leaving me alone to explain this mess somehow to the client. After the meeting it finally dawned on me where the heck that ghastly "90%" figure had come from, it was in fact the relative size of the requirements gap! Later discussion with my boss reluctantly revealed him as having totally underestimated the client's expectations, that the project was already way over budget even before it was assigned to me, and then told me to "just find a way to fix it ASAP!". I was of course outraged and pointed out how utterly unreasonable that was, and after several weeks of fingerpointing and me hopelessly trying to come up with a silver-bullet to rescue the project, the stupid boss still had the nerve to fire me for not succeeding! Not only was I completely run over by this fool, but the treatment I recieved was also a multiple-violation of worker legislation. Fortunately for me it didn't take long to find a new (and much better!) job, and I wasn't at all surprised recently when I found out that the previous company is now out of business and has been filed for bankruptcy

                          G Offline
                          G Offline
                          GuyThiebaut
                          wrote on last edited by
                          #21

                          Man - that sucks, sounds like you had a really bad experience. However like you say - the chickens eventually came home to roost.

                          Continuous effort - not strength or intelligence - is the key to unlocking our potential.(Winston Churchill)
                          1 Reply Last reply
                          0
                          • G GuyThiebaut

                            J4amieC wrote:

                            It should be pretty obvious that the required answer is one of 25,50,75 or 100% complete

                            What is obvious to me is that a percentage is made up of 100 individual parts whereas 25,50,75,100 is more a of fourths kind of thing. So would it not be be more obvious to ask "How many fourths of the project are complete"? Maybe if the PM explained they wanted it in quarters I would understand what they meant by percent. :)

                            You always pass failure on the way to success.
                            J Offline
                            J Offline
                            Jeremy Thornton
                            wrote on last edited by
                            #22

                            At least you only get 100 parts to play with I have to complete forms that ask "... what is the probability of reaching goal (blah-blah) by date (some stupid date in the near future)" so that would be a number plucked from the infinity between 0 and 1 then? :confused:

                            1 Reply Last reply
                            0
                            Reply
                            • Reply as topic
                            Log in to reply
                            • Oldest to Newest
                            • Newest to Oldest
                            • Most Votes


                            • Login

                            • Don't have an account? Register

                            • Login or register to search.
                            • First post
                              Last post
                            0
                            • Categories
                            • Recent
                            • Tags
                            • Popular
                            • World
                            • Users
                            • Groups