What do you do after the project finished?
-
Visit http://www.codeproject.com/lounge.asp[^]. (
For lazing about and discussing anything that takes your fancy
)Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
Update your resume - once the project is built, the initial developer is no longer needed. The GrinMan
-
Should we add every project in resume? How about it's a small project, less than 10 person*month..
Resume writing itself is a skilled art. The first introduction or the first profile that crashes inside to a potential employers desk would be like an advertising brochure showcasing your world-class projects. Then slowly, when a call comes along, you would show up your prowess and potential, opening each one, one at a time or '
Flood-Gates-Opened
' as the case may deem fit appropriately. :)Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
Just take a break ie., leave for one week and enjoy as much as you want? And return to office for the next project.
SSK.
True Satips. "All work and no play makes Jack a dull boy". My preferred tours would be a bit of temples. :)
Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
At the very start, I suggest our team to write some comment in code. Then use NDoc or VS.NET IDE to generate some HTML files. But, we have a problem to do this. The code is write for Japanese clients, so we cannot write Chinese comment in it. unfortunately, our English are poor too. at last, we give up write comments in code... because of the language reason. :^)
-
WuJunyin wrote:
No break, No bonus. Our company no those boon....
Is your managers following the policies of Adolf Hitler? :mad:
[Nothing to offend]
Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
WuJunyin wrote:
No break, No bonus. Our company no those boon....
Is your managers following the policies of Adolf Hitler? :mad:
[Nothing to offend]
Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
Resume writing itself is a skilled art. The first introduction or the first profile that crashes inside to a potential employers desk would be like an advertising brochure showcasing your world-class projects. Then slowly, when a call comes along, you would show up your prowess and potential, opening each one, one at a time or '
Flood-Gates-Opened
' as the case may deem fit appropriately. :)Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
You could have used ghost doc also
_________________________ "When the superior man refrains from acting, his force is felt for a thousand li." Sun Tzu
-
After the project finished -> means coding and test were completed. What do you do if no task assign to you? Write coding document? or Write refactoring ? or others... -------------------------------------------------------------------- We are drawing flow diagram for important event, like button click... Does this helpful in the future?
start the documentation :sigh: Steve
-
start the documentation :sigh: Steve
-
After the project finished -> means coding and test were completed. What do you do if no task assign to you? Write coding document? or Write refactoring ? or others... -------------------------------------------------------------------- We are drawing flow diagram for important event, like button click... Does this helpful in the future?
Just pulled out my mobile from my bag and just thought there is one thing to add. Connect the headset enhancement and Tune into '
Big 92.7 FM
' (http://www.big927fm.com/[^]) with Nokia 6030.Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
Just pulled out my mobile from my bag and just thought there is one thing to add. Connect the headset enhancement and Tune into '
Big 92.7 FM
' (http://www.big927fm.com/[^]) with Nokia 6030.Vasudevan Deepak Kumar Personal Homepage Tech Gossips
-
After the project finished -> means coding and test were completed. What do you do if no task assign to you? Write coding document? or Write refactoring ? or others... -------------------------------------------------------------------- We are drawing flow diagram for important event, like button click... Does this helpful in the future?
Visit CP!! and wait for QA to email me with :rolleyes:'Well done all Passed!':rolleyes: try and have a rest before i start a new project, read up on whats new in the world of programming. i put coding document as part of the project:sigh:
Code Project Lounge 101 by John Cardinal :beer::bob::beer:
-
After the project finished -> means coding and test were completed. What do you do if no task assign to you? Write coding document? or Write refactoring ? or others... -------------------------------------------------------------------- We are drawing flow diagram for important event, like button click... Does this helpful in the future?
-
After project finished I don't have vacation And I don't want to write document... And I don't drink beer... And my code is perfect without bug... So I will post shareable code to CodeProject! :)
-
Visit CP!! and wait for QA to email me with :rolleyes:'Well done all Passed!':rolleyes: try and have a rest before i start a new project, read up on whats new in the world of programming. i put coding document as part of the project:sigh:
Code Project Lounge 101 by John Cardinal :beer::bob::beer:
-
After the project finished -> means coding and test were completed. What do you do if no task assign to you? Write coding document? or Write refactoring ? or others... -------------------------------------------------------------------- We are drawing flow diagram for important event, like button click... Does this helpful in the future?
If the testing is complete and signed off then you certainly do not touch the code - or the testing would have to be done again. If there are gaps in the documentation now is a great time to do them because you're going to need them when the project is released.
'--8<------------------------ Ex Datis: Duncan Jones Merrion Computing Ltd
-
"Finished"? It's never finished. Go back to the first part you wrote and see whether or not you can write it better. Also, keep your head down and look busy.
I am 100% agree. I work for kind of in house systems and the systems don't have anything to say that we are complete or this project is over. I work simultenuusly in 3-4 projects and after 6 months of one project had been finished we do bug tracking and improvement.
Jwalant Soneji (BE IT) (India) Mobile: +91 9969059127 At Winodows Live Spaces At Yahoo! 360 At BlogSpot
-
If the testing is complete and signed off then you certainly do not touch the code - or the testing would have to be done again. If there are gaps in the documentation now is a great time to do them because you're going to need them when the project is released.
'--8<------------------------ Ex Datis: Duncan Jones Merrion Computing Ltd
Documentation should be PART of the project, not something tacked on after it. If your PM isn't giving you time to document as you work then give him a slap for being unproffessional. As for finishing projects; A smart person only ever starts projects, hand over to someone else and start a new project way before anything could hit the fan :-D