Giving range to Run time end and start date parameter
C#
1
Posts
1
Posters
0
Views
1
Watching
-
Hi all, crystal reports are new for me. i need help for creating a report having two parameter which takes Start Date and End Date which contain the range of dates and when i select dates it show related reports.i want to fix date ranges at run time using C# code. I take a code from an article but it doesn't work. If u have any article plz give me link i will consult it. advance thnx 4 help