Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse
Code Project
  1. Home
  2. The Lounge
  3. Current workload

Current workload

Scheduled Pinned Locked Moved The Lounge
question
32 Posts 22 Posters 0 Views 1 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • S Slacker007

    How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

    Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
    "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

    G Offline
    G Offline
    Gary Wheeler
    wrote on last edited by
    #8

    Four major products and one minor, each with a development branch and a maintenance branch. Department servers admin, SourceSafe admin, build process developer, internal tools developer, and technical writer for the department. My weekly status report routinely has 12-15 entries, divided by functional area. I occasionally have days where I spend the entire time working on a single task. My typical day has 2-3 things going simultaneously (write code on product A while product B is building, that sort of thing).

    Software Zen: delete this;

    1 Reply Last reply
    0
    • S Slacker007

      Chris Losinger wrote:

      i'm either supporting or developing at least ten different projects right now.

      How many hours a day do you put in on average for these ten projects? Just curious. I put in about 9 to 10 hours a day right now and will be for about another 6 months. Unfortunately, I am salaried.

      Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
      "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

      C Offline
      C Offline
      Chris Losinger
      wrote on last edited by
      #9

      Slacker007 wrote:

      How many hours a day do you put in on average for these ten projects?

      i work 8-9 hours each day. but it's hard to say how those hours divide amongst the various projects. most of the projects are in a support phase, so i only need to touch them when issues come up. but, some of them are very active and generate a lot of issues, so i spend a couple of days a week on them. a couple of projects are new development, so i try to spend as much time on them as i can, but they tend to get bumped by urgent support issues. i just try to get it all done.

      image processing toolkits | batch image processing

      F 1 Reply Last reply
      0
      • S Slacker007

        How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

        Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
        "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

        E Offline
        E Offline
        Ennis Ray Lynch Jr
        wrote on last edited by
        #10

        I have to rewrite 20 Windows Services and update an application that interfaces with the EPA. But if you want to compare active clients, I only have 2 atm, 4 on call though. The biggest challenge is that their emergencies always sync. Although, I would rather have too many clients so I could hire staff than not enough.

        Need custom software developed? I do custom programming based primarily on MS tools with an emphasis on C# development and consulting. I also do Android Programming as I find it a refreshing break from the MS. "And they, since they Were not the one dead, turned to their affairs" -- Robert Frost

        S 1 Reply Last reply
        0
        • E Ennis Ray Lynch Jr

          I have to rewrite 20 Windows Services and update an application that interfaces with the EPA. But if you want to compare active clients, I only have 2 atm, 4 on call though. The biggest challenge is that their emergencies always sync. Although, I would rather have too many clients so I could hire staff than not enough.

          Need custom software developed? I do custom programming based primarily on MS tools with an emphasis on C# development and consulting. I also do Android Programming as I find it a refreshing break from the MS. "And they, since they Were not the one dead, turned to their affairs" -- Robert Frost

          S Offline
          S Offline
          Slacker007
          wrote on last edited by
          #11

          Ennis Ray Lynch, Jr. wrote:

          have to rewrite 20 Windows Services

          only 20? sounds like you have your work cut out for you. I too, would rather have too many contracts then no contracts. :thumbsup:

          Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
          "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

          1 Reply Last reply
          0
          • S Slacker007

            How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

            Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
            "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

            K Offline
            K Offline
            kevinnicol
            wrote on last edited by
            #12

            I am on four that require daily attention, 10 that require work on at least a weekly basis and a total of 20 that I am responsible for. I have so many various IDE's open I don't know how my computer can support it. Thankfully I can run two eclipses, and four each of visual studio 2010, 2008 and 2005.

            1 Reply Last reply
            0
            • S Slacker007

              How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

              Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
              "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

              D Offline
              D Offline
              Dr Walt Fair PE
              wrote on last edited by
              #13

              My workload varies wildly, depending on who calls me. Right now I have 2 on-going projects, and 3 waiting for info, approval to start, etc. Plus my own software development. Not counting studying for my qualifying exams next week and my research efforts so I can graduate sometime.

              CQ de W5ALT

              Walt Fair, Jr., P. E. Comport Computing Specializing in Technical Engineering Software

              S 1 Reply Last reply
              0
              • D Dr Walt Fair PE

                My workload varies wildly, depending on who calls me. Right now I have 2 on-going projects, and 3 waiting for info, approval to start, etc. Plus my own software development. Not counting studying for my qualifying exams next week and my research efforts so I can graduate sometime.

                CQ de W5ALT

                Walt Fair, Jr., P. E. Comport Computing Specializing in Technical Engineering Software

                S Offline
                S Offline
                Slacker007
                wrote on last edited by
                #14

                Good to see you around, Walt. :)

                Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                1 Reply Last reply
                0
                • S Slacker007

                  How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

                  Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                  "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                  P Offline
                  P Offline
                  Phil_Murray
                  wrote on last edited by
                  #15

                  At 14 at the moment at various states in the life cycle :((

                  L 1 Reply Last reply
                  0
                  • S Slacker007

                    How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

                    Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                    "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                    T Offline
                    T Offline
                    Tony Wright UK
                    wrote on last edited by
                    #16

                    I work on only 1 main project, but have about 6 sub-projects. Then there's the day to day stuff like keeping it all running (everything from the hardware up), bug fixes, new work requests etc. An 8 hour day is a short (and rare) day!

                    1 Reply Last reply
                    0
                    • P Phil_Murray

                      At 14 at the moment at various states in the life cycle :((

                      L Offline
                      L Offline
                      loctrice
                      wrote on last edited by
                      #17

                      Life cycle... what's that?! I have chicken scratch and my own design docs all over my desk, but it's not a policy. We use the "sit down and code" method here. Note: in the following process it's very important to keep the actual code and progress as secretive as possible. 1- Start writing the program with no type of planning other than what you want it to do, don't waste time on design or collaboration. 2- Follow the "move this left", "this should be bigger", "that's the wrong color" instead of finishing 3- Write massive side modules/objects/functions/etc because of poor planning 4- Follow the "move this left", "this should be bigger", "that's the wrong color" instead of finishing 5- Forget project and move to the next exciting tangent from management 6- Hack in bandaids and go to production with unfinished product 7- Forget product until 2 weeks before next time it's going to be used , at which case you start over I just brought up SCRUM and/or AGILE recently. I've heard someone brought it up before and failed,I can only hope it takes.

                      J 1 Reply Last reply
                      0
                      • L loctrice

                        Life cycle... what's that?! I have chicken scratch and my own design docs all over my desk, but it's not a policy. We use the "sit down and code" method here. Note: in the following process it's very important to keep the actual code and progress as secretive as possible. 1- Start writing the program with no type of planning other than what you want it to do, don't waste time on design or collaboration. 2- Follow the "move this left", "this should be bigger", "that's the wrong color" instead of finishing 3- Write massive side modules/objects/functions/etc because of poor planning 4- Follow the "move this left", "this should be bigger", "that's the wrong color" instead of finishing 5- Forget project and move to the next exciting tangent from management 6- Hack in bandaids and go to production with unfinished product 7- Forget product until 2 weeks before next time it's going to be used , at which case you start over I just brought up SCRUM and/or AGILE recently. I've heard someone brought it up before and failed,I can only hope it takes.

                        J Offline
                        J Offline
                        JackDingler
                        wrote on last edited by
                        #18

                        I used to work in that kind of environment. I'll add... 1. Finish project A. 2. Have it canned because someone has feelings that it may be too buggy. (ie: Doesn't want to allocate resources for testing) 3. Start a new high priority project B. 4. Start a new high priority project C. 5. A is now a priority again. 6. Merge Project A, with no changes into a very old incompatible code base. 7. Accept criticism that that I made too many changes to force incompatible code to work together. 8. Jump to B. It's now hot... 9. Explain why I'm not done with C. 10. Watch A get put through another developmental cycle because of feelings... And so on....

                        L 1 Reply Last reply
                        0
                        • S Slacker007

                          How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

                          Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                          "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                          R Offline
                          R Offline
                          rtpHarry
                          wrote on last edited by
                          #19

                          I have got 17 projects on the wall of varying size between a team of two

                          B 1 Reply Last reply
                          0
                          • J JackDingler

                            I used to work in that kind of environment. I'll add... 1. Finish project A. 2. Have it canned because someone has feelings that it may be too buggy. (ie: Doesn't want to allocate resources for testing) 3. Start a new high priority project B. 4. Start a new high priority project C. 5. A is now a priority again. 6. Merge Project A, with no changes into a very old incompatible code base. 7. Accept criticism that that I made too many changes to force incompatible code to work together. 8. Jump to B. It's now hot... 9. Explain why I'm not done with C. 10. Watch A get put through another developmental cycle because of feelings... And so on....

                            L Offline
                            L Offline
                            loctrice
                            wrote on last edited by
                            #20

                            JackDingler wrote:

                            1. Finish project A.

                            I can agree with everything but that. We are not in the business of finalizing anything. I understand that software isn't ever "finalized", but I hope you get my meaning :D Switching priorities is not even that big of a deal to me. It's that there is no good way to go about a set of software at all. There is no design, there is no group/team implementation, there is no good time for other people to give input. We have people worried about design hammering you before you even get done with the product. We have projects that are hoarded, etc. I could jump from a to b and back and forth if there was even a definition of the software. Sometimes I asked to take over project B , or implement something on someone elses software.... and there is no good way to do it.

                            J 1 Reply Last reply
                            0
                            • L loctrice

                              JackDingler wrote:

                              1. Finish project A.

                              I can agree with everything but that. We are not in the business of finalizing anything. I understand that software isn't ever "finalized", but I hope you get my meaning :D Switching priorities is not even that big of a deal to me. It's that there is no good way to go about a set of software at all. There is no design, there is no group/team implementation, there is no good time for other people to give input. We have people worried about design hammering you before you even get done with the product. We have projects that are hoarded, etc. I could jump from a to b and back and forth if there was even a definition of the software. Sometimes I asked to take over project B , or implement something on someone elses software.... and there is no good way to do it.

                              J Offline
                              J Offline
                              JackDingler
                              wrote on last edited by
                              #21

                              That happens a lot in this industry.

                              1 Reply Last reply
                              0
                              • N Nagy Vilmos

                                I've got two projects on: - one has me running around picking up the toys to put them back in the pram. - the other alternates between needing to be spoon fed and shitting all over us. :-D Happy days indeed.


                                Panic, Chaos, Destruction. My work here is done. Drink. Get drunk. Fall over - P O'H OK, I will win to day or my name isn't Ethel Crudacre! - DD Ethel Crudacre I cannot live by bread alone. Bacon and ketchup are needed as well. - Trollslayer Have a bit more patience with newbies. Of course some of them act dumb - they're often *students*, for heaven's sake - Terry Pratchett

                                D Offline
                                D Offline
                                db7uk
                                wrote on last edited by
                                #22

                                Few, I thought I was the only one with this issue. I feel like part of a family now! :-D

                                1 Reply Last reply
                                0
                                • R rtpHarry

                                  I have got 17 projects on the wall of varying size between a team of two

                                  B Offline
                                  B Offline
                                  baskinhu
                                  wrote on last edited by
                                  #23

                                  0 to 1 projects per day for the past 6 months. This s*cks eggs... :(

                                  1 Reply Last reply
                                  0
                                  • S Slacker007

                                    How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

                                    Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                                    "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                                    I Offline
                                    I Offline
                                    I explore code
                                    wrote on last edited by
                                    #24

                                    couple of months ago, the count was 3 now its 2. On an average I always find myself working on 2 projects, with occasional interruptions in the form of issues for the deployed systems (setting up data, solving site crashes or expired server security certificates etc). A new project is coming my way in the upcoming weeks, but hopefully by then one of the projects i m on at the moment will have been deployed. Oh and I have 1 personal project at home under development, 1 project that i m yet to start and 1 that is sort of in the PoC mode...

                                    1 Reply Last reply
                                    0
                                    • S Slacker007

                                      How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

                                      Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                                      "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                                      V Offline
                                      V Offline
                                      virang_21
                                      wrote on last edited by
                                      #25

                                      I am currently working on 7 ( Yes Seven ) projects... I work for a large corporate that has 5 companies and just one IT team and I am fortunate enough to work on seven projects at a time.. All my processors are at full throttle... :)

                                      Zen and the art of software maintenance : rm -rf * Math is like love : a simple idea but it can get complicated.

                                      1 Reply Last reply
                                      0
                                      • S Slacker007

                                        How many projects are you working on right now? I am currently working on four and it is becoming quite the challenge.

                                        Just along for the ride. "the meat from that butcher is just the dogs danglies, absolutely amazing cuts of beef." - DaveAuld (2011)
                                        "No, that is just the earthly manifestation of the Great God Retardon." - Nagy Vilmos (2011) "It is the celestial scrotum of good luck!" - Nagy Vilmos (2011)

                                        0 Offline
                                        0 Offline
                                        0bx
                                        wrote on last edited by
                                        #26

                                        That depends on how you define "working on". I'm currently "involved" in a lot of projects. There's nothing big on the table at the moment.

                                        Giraffes are not real.

                                        1 Reply Last reply
                                        0
                                        • N Nagy Vilmos

                                          I've got two projects on: - one has me running around picking up the toys to put them back in the pram. - the other alternates between needing to be spoon fed and shitting all over us. :-D Happy days indeed.


                                          Panic, Chaos, Destruction. My work here is done. Drink. Get drunk. Fall over - P O'H OK, I will win to day or my name isn't Ethel Crudacre! - DD Ethel Crudacre I cannot live by bread alone. Bacon and ketchup are needed as well. - Trollslayer Have a bit more patience with newbies. Of course some of them act dumb - they're often *students*, for heaven's sake - Terry Pratchett

                                          F Offline
                                          F Offline
                                          Florin Jurcovici 0
                                          wrote on last edited by
                                          #27

                                          Challenging indeed. And long-term - job safety guaranteed? :laugh:

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Don't have an account? Register

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups