Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse
Code Project
  1. Home
  2. The Lounge
  3. How to Quantify Your Work

How to Quantify Your Work

Scheduled Pinned Locked Moved The Lounge
helptutorialquestiondiscussion
27 Posts 12 Posters 0 Views 1 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • Richard Andrew x64R Offline
    Richard Andrew x64R Offline
    Richard Andrew x64
    wrote on last edited by
    #1

    If this is the wrong forum for this discussion, please indicate the correct one, and I'll happily move over there. How do people who do contract work quantify their work for the purpose of determining what to charge for a given project? I'm not asking how much I should charge, which would be illegal. Rather, I'm asking for some help in knowing how to figure it out for myself. So do you like to charge by the hour, or by the project? And how should one know when to choose one or the other? Thanks, Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

    P C N C L 8 Replies Last reply
    0
    • Richard Andrew x64R Richard Andrew x64

      If this is the wrong forum for this discussion, please indicate the correct one, and I'll happily move over there. How do people who do contract work quantify their work for the purpose of determining what to charge for a given project? I'm not asking how much I should charge, which would be illegal. Rather, I'm asking for some help in knowing how to figure it out for myself. So do you like to charge by the hour, or by the project? And how should one know when to choose one or the other? Thanks, Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

      P Offline
      P Offline
      Paul Conrad
      wrote on last edited by
      #2

      Rich, I generally charge by the hour. I have been making a slow transition to charging by the project. Paul

      Richard Andrew x64R 1 Reply Last reply
      0
      • P Paul Conrad

        Rich, I generally charge by the hour. I have been making a slow transition to charging by the project. Paul

        Richard Andrew x64R Offline
        Richard Andrew x64R Offline
        Richard Andrew x64
        wrote on last edited by
        #3

        Paul, That's interesting, can you say why you want to move from hourly to per project? What problems were you having with charging by the hour? Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

        P C 2 Replies Last reply
        0
        • Richard Andrew x64R Richard Andrew x64

          If this is the wrong forum for this discussion, please indicate the correct one, and I'll happily move over there. How do people who do contract work quantify their work for the purpose of determining what to charge for a given project? I'm not asking how much I should charge, which would be illegal. Rather, I'm asking for some help in knowing how to figure it out for myself. So do you like to charge by the hour, or by the project? And how should one know when to choose one or the other? Thanks, Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

          C Offline
          C Offline
          code frog 0
          wrote on last edited by
          #4

          This is the science of contracting. I do it largely based upon my work as an employee. I wrote a lot of systems and got to be pretty good at establishing timelines for products. Now I do the same but for myself. It really comes down to listing out each item and feature requested by the customer and applying time to it (I'm actually doing this right now, this very moment.). I've got a list of things the customer wants and I'm going through and stubbing out the time I think it will take. While I do this I'm drafting a second document of questions I will send to the customer for clarification. I will then take the answers tie them into my main document and total the hours. I use some small factors to account for changes and hiccups. I calculate those seperately and divide them by 2. The customer pays for half of those costs and I accept the other half which in my experience has always proven a fair thing to do. I get a total hours apply an appropriate rate to it and hit send.


          If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
          Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

          People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[^] and your eyes are suddenly open to all sorts of useful things all through Firefox. - (Self Quote)

          Richard Andrew x64R 1 Reply Last reply
          0
          • C code frog 0

            This is the science of contracting. I do it largely based upon my work as an employee. I wrote a lot of systems and got to be pretty good at establishing timelines for products. Now I do the same but for myself. It really comes down to listing out each item and feature requested by the customer and applying time to it (I'm actually doing this right now, this very moment.). I've got a list of things the customer wants and I'm going through and stubbing out the time I think it will take. While I do this I'm drafting a second document of questions I will send to the customer for clarification. I will then take the answers tie them into my main document and total the hours. I use some small factors to account for changes and hiccups. I calculate those seperately and divide them by 2. The customer pays for half of those costs and I accept the other half which in my experience has always proven a fair thing to do. I get a total hours apply an appropriate rate to it and hit send.


            If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
            Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

            People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[^] and your eyes are suddenly open to all sorts of useful things all through Firefox. - (Self Quote)

            Richard Andrew x64R Offline
            Richard Andrew x64R Offline
            Richard Andrew x64
            wrote on last edited by
            #5

            That's the way I would like to do it, also. But I am afraid to charge too much, because what might take me 30 hours to do, might take a really great developer only 15 hours. So there seems to be an inverse relationship there somewhere. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

            C N 2 Replies Last reply
            0
            • Richard Andrew x64R Richard Andrew x64

              Paul, That's interesting, can you say why you want to move from hourly to per project? What problems were you having with charging by the hour? Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

              P Offline
              P Offline
              Paul Conrad
              wrote on last edited by
              #6

              Troposphere wrote:

              why you want to move from hourly to per project?

              I am wrapping up my Master's Thesis at the moment and I did a study on Personal Software Process by Watts Humphrey at Carnegie Mellon University in Pittsburg and it deals with alot of estimation based on previous code/projects. I've found that estimations for new projects have closely reflected total hours, so I've started to charge by the project and have come out about the same.

              P 1 Reply Last reply
              0
              • Richard Andrew x64R Richard Andrew x64

                That's the way I would like to do it, also. But I am afraid to charge too much, because what might take me 30 hours to do, might take a really great developer only 15 hours. So there seems to be an inverse relationship there somewhere. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                C Offline
                C Offline
                code frog 0
                wrote on last edited by
                #7

                Well of course you balance those things in. You also have to temper yourself. If you want to get a lot of money for 1 project you will. If you want to get financial independence from many projects then do not get a lot of money for 1. Which is to say that as you go through a feature and hit one that you are sure is complicated as you've not done it bill for what you think it would take a seasoned developer to do but include the hours you think it will take you to do (does that make sense?). You don't want to promise 3000 hours of work in 2800 hours that would be a bind. When I spec out something I tend to understand right away what makes it tricky. I then stop and google what I think would work and see what I can learn from the results (in most cases CP is high in the results and that's a nice thing). The other thing that I do (and I've done it a lot). Is that I might come up with a number in total. It's a number I think is right but might be a touch high. I always have my clients do 1/3 up front 2/3 at half way and the final 3/3 at delivery. It's not uncommon for me to drop that final balance by a hefty amount depending on how much time something took. The client likes it, you look like a saint and I guarantee you just got some paid advertising. You feel this stuff out though.


                If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
                Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

                People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[

                Richard Andrew x64R 1 Reply Last reply
                0
                • C code frog 0

                  Well of course you balance those things in. You also have to temper yourself. If you want to get a lot of money for 1 project you will. If you want to get financial independence from many projects then do not get a lot of money for 1. Which is to say that as you go through a feature and hit one that you are sure is complicated as you've not done it bill for what you think it would take a seasoned developer to do but include the hours you think it will take you to do (does that make sense?). You don't want to promise 3000 hours of work in 2800 hours that would be a bind. When I spec out something I tend to understand right away what makes it tricky. I then stop and google what I think would work and see what I can learn from the results (in most cases CP is high in the results and that's a nice thing). The other thing that I do (and I've done it a lot). Is that I might come up with a number in total. It's a number I think is right but might be a touch high. I always have my clients do 1/3 up front 2/3 at half way and the final 3/3 at delivery. It's not uncommon for me to drop that final balance by a hefty amount depending on how much time something took. The client likes it, you look like a saint and I guarantee you just got some paid advertising. You feel this stuff out though.


                  If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
                  Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

                  People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[

                  Richard Andrew x64R Offline
                  Richard Andrew x64R Offline
                  Richard Andrew x64
                  wrote on last edited by
                  #8

                  Thanks for your thoughtful reply. I like your 1/3, 2/3, 3/3 method. It seems very flexible and fair. If there's one thing I can't stand is when I agree on a price for a project, and then the guy starts piling on the list of requirements, and it soon gets out of hand, but I can't say anything cause I already agreed to a price! :mad: ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                  C P 3 Replies Last reply
                  0
                  • Richard Andrew x64R Richard Andrew x64

                    Thanks for your thoughtful reply. I like your 1/3, 2/3, 3/3 method. It seems very flexible and fair. If there's one thing I can't stand is when I agree on a price for a project, and then the guy starts piling on the list of requirements, and it soon gets out of hand, but I can't say anything cause I already agreed to a price! :mad: ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                    C Offline
                    C Offline
                    code frog 0
                    wrote on last edited by
                    #9

                    That's where your list of requirements comes in. The customer should sign something (that they get a copy of) that explains: This list summarizes the full and complete set of features. Any enhancements or additions to these features will come at an extra-cost and an extended time-line. I usually add that a $500 minimum is added to the top of any changes once the customer has signed the enclosed requirements and returned it. The $500 makes them really pause and think that maybe version 1.1 would be a better time to ask. Either way, you have a signed agreement that states they will pay more, they agreed to pay more and their signature proves such. Only then do you write even a single line of code.


                    If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
                    Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

                    People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[^] and your eyes are suddenly open to all sorts of useful things all through Firefox. - (Self Quote)

                    1 Reply Last reply
                    0
                    • Richard Andrew x64R Richard Andrew x64

                      Thanks for your thoughtful reply. I like your 1/3, 2/3, 3/3 method. It seems very flexible and fair. If there's one thing I can't stand is when I agree on a price for a project, and then the guy starts piling on the list of requirements, and it soon gets out of hand, but I can't say anything cause I already agreed to a price! :mad: ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                      C Offline
                      C Offline
                      code frog 0
                      wrote on last edited by
                      #10

                      In addition to what I've already said. There are times where I can tell I've charged to much and so if the customer says, "Hey can we have this?" I very carefully explain that, "Yes, I will do this and I will do it at no charge but this is all I will do." It's fair for you to do, they love it and in the end your bill is more fair to them. Somehow you have to make sure to balance things out if you charge to much. If you don't charge enough you chalk it up to experience and you remember the next time you do a similar thing.


                      If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
                      Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

                      People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[^] and your eyes are suddenly open to all sorts of useful things all through Firefox. - (Self Quote)

                      Richard Andrew x64R 1 Reply Last reply
                      0
                      • Richard Andrew x64R Richard Andrew x64

                        If this is the wrong forum for this discussion, please indicate the correct one, and I'll happily move over there. How do people who do contract work quantify their work for the purpose of determining what to charge for a given project? I'm not asking how much I should charge, which would be illegal. Rather, I'm asking for some help in knowing how to figure it out for myself. So do you like to charge by the hour, or by the project? And how should one know when to choose one or the other? Thanks, Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                        N Offline
                        N Offline
                        normanS
                        wrote on last edited by
                        #11

                        Troposphere wrote:

                        I'm not asking how much I should charge, which would be illegal

                        What would be illegal about asking how much you should charge?

                        Richard Andrew x64R 1 Reply Last reply
                        0
                        • C code frog 0

                          In addition to what I've already said. There are times where I can tell I've charged to much and so if the customer says, "Hey can we have this?" I very carefully explain that, "Yes, I will do this and I will do it at no charge but this is all I will do." It's fair for you to do, they love it and in the end your bill is more fair to them. Somehow you have to make sure to balance things out if you charge to much. If you don't charge enough you chalk it up to experience and you remember the next time you do a similar thing.


                          If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
                          Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

                          People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[^] and your eyes are suddenly open to all sorts of useful things all through Firefox. - (Self Quote)

                          Richard Andrew x64R Offline
                          Richard Andrew x64R Offline
                          Richard Andrew x64
                          wrote on last edited by
                          #12

                          code-frog wrote:

                          Somehow you have to make sure to balance things out if you charge to much. If you don't charge enough you chalk it up to experience and you remember the next time you do a similar thing.

                          That makes a whole lot of sense. Thank you for your wise counsel. :cool: ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                          1 Reply Last reply
                          0
                          • N normanS

                            Troposphere wrote:

                            I'm not asking how much I should charge, which would be illegal

                            What would be illegal about asking how much you should charge?

                            Richard Andrew x64R Offline
                            Richard Andrew x64R Offline
                            Richard Andrew x64
                            wrote on last edited by
                            #13

                            There are laws that say that if you discuss price figures, it might constitute price fixing. So you have to be careful. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                            N 1 Reply Last reply
                            0
                            • Richard Andrew x64R Richard Andrew x64

                              Paul, That's interesting, can you say why you want to move from hourly to per project? What problems were you having with charging by the hour? Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                              C Offline
                              C Offline
                              code frog 0
                              wrote on last edited by
                              #14

                              You get way more "Yes" answers from customers when they know the total price up front. When the customer hears "by the hour" some of them think of the last electrician or plumber they called and they politely say "No". It's always better to cap your bill you can budget your income the customer can budget their expense and in the end almost everyone is happy.


                              If we all used the Plain English compiler every post in the lounge would be a programming question.:cool:
                              Welcome to CP in your language. Post the unicode version in My CP Blog [ ^ ] now.

                              People who don't understand how awesome Firefox is have never used CPhog[^]CPhog. The act of using CPhog (Firefox)[^] alone doesn't make Firefox cool. It opens your eyes to the possibilities and then you start looking for other things like CPhog (Firefox)[^] and your eyes are suddenly open to all sorts of useful things all through Firefox. - (Self Quote)

                              1 Reply Last reply
                              0
                              • Richard Andrew x64R Richard Andrew x64

                                That's the way I would like to do it, also. But I am afraid to charge too much, because what might take me 30 hours to do, might take a really great developer only 15 hours. So there seems to be an inverse relationship there somewhere. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                                N Offline
                                N Offline
                                normanS
                                wrote on last edited by
                                #15

                                Surely you are not trying to charge the same as a great developer? You can quote for 30 hours when a great developer would quote 15 hours, but then you should also quote 100 per hour, when a great developer would quote 250 per hour. The customer is quoted 3000 for your job or 3750 for the great developer's job. Why will the customer even look at the great developer's quote? Because (a) the great developer has a reputation of being able to do the job, you may never finish it, (b) the customer has to wait much longer for you to do the job, (c) the great developer will do a great job (part of the reputation thing maybe), while you may produce something unsupportable.

                                Richard Andrew x64R 1 Reply Last reply
                                0
                                • N normanS

                                  Surely you are not trying to charge the same as a great developer? You can quote for 30 hours when a great developer would quote 15 hours, but then you should also quote 100 per hour, when a great developer would quote 250 per hour. The customer is quoted 3000 for your job or 3750 for the great developer's job. Why will the customer even look at the great developer's quote? Because (a) the great developer has a reputation of being able to do the job, you may never finish it, (b) the customer has to wait much longer for you to do the job, (c) the great developer will do a great job (part of the reputation thing maybe), while you may produce something unsupportable.

                                  Richard Andrew x64R Offline
                                  Richard Andrew x64R Offline
                                  Richard Andrew x64
                                  wrote on last edited by
                                  #16

                                  Well of course I am not charging what I think a super duper developer should get. I am going by what I earned per hour at my last job, and figuring in added expenses for being on my own, instead of being an employee. But your point is well taken. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                                  N 1 Reply Last reply
                                  0
                                  • Richard Andrew x64R Richard Andrew x64

                                    There are laws that say that if you discuss price figures, it might constitute price fixing. So you have to be careful. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                                    N Offline
                                    N Offline
                                    normanS
                                    wrote on last edited by
                                    #17

                                    Unlikely. If you discuss prices with all (or most) possible suppliers, it could constitue price fixing. These days, everyone and their dog can write programs, so price fixing is almost impossible. If the customer only asks a small number of suppliers for quotes, hmmm. . . maybe then you would have to take care not to discuss too much.

                                    S 1 Reply Last reply
                                    0
                                    • Richard Andrew x64R Richard Andrew x64

                                      Well of course I am not charging what I think a super duper developer should get. I am going by what I earned per hour at my last job, and figuring in added expenses for being on my own, instead of being an employee. But your point is well taken. ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                                      N Offline
                                      N Offline
                                      normanS
                                      wrote on last edited by
                                      #18

                                      Of course, I don't know much about quoting for jobs - I'm a salaried employee, and always have been (except for a year of contracting some years back.) Since getting married, kids, house, car, etc., the risk became something to consider. I did a few jobs "on the side" (against company regulations, but I decided there was no conflict of interests) but I only charged about the same as my pre-tax salary per hour. Then again, that was backdoor money - no taxes, etc. Nice pocket-money for 50 hours a month!

                                      1 Reply Last reply
                                      0
                                      • Richard Andrew x64R Richard Andrew x64

                                        If this is the wrong forum for this discussion, please indicate the correct one, and I'll happily move over there. How do people who do contract work quantify their work for the purpose of determining what to charge for a given project? I'm not asking how much I should charge, which would be illegal. Rather, I'm asking for some help in knowing how to figure it out for myself. So do you like to charge by the hour, or by the project? And how should one know when to choose one or the other? Thanks, Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                                        C Offline
                                        C Offline
                                        Christian Graus
                                        wrote on last edited by
                                        #19

                                        At first, I did it based on how much money I needed to buy something I wanted, plus a couple of CDs and maybe dinner with the wife :P Nowadays, I'm much more scientific. I actually invoice my one client every month for work done, so I can work out hours after. VSTS is very helpful in this regard. Christian Graus - Microsoft MVP - C++

                                        1 Reply Last reply
                                        0
                                        • Richard Andrew x64R Richard Andrew x64

                                          If this is the wrong forum for this discussion, please indicate the correct one, and I'll happily move over there. How do people who do contract work quantify their work for the purpose of determining what to charge for a given project? I'm not asking how much I should charge, which would be illegal. Rather, I'm asking for some help in knowing how to figure it out for myself. So do you like to charge by the hour, or by the project? And how should one know when to choose one or the other? Thanks, Rich ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸¸,ø¤º°`°º¤ø,¸

                                          L Offline
                                          L Offline
                                          Lost User
                                          wrote on last edited by
                                          #20

                                          By the hour normally. However, if you are doing one off work, the client might want a fixed price. So, work out how long it will take and base your quote on that. Sometimes it will take longer, sometimes shorter, but what you must ensure with this is that the requirements are very strongly agreed on otherwise the client cna keep you tweaking and tuning for ever, without paying you. Nunc est bibendum

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Don't have an account? Register

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups