Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse
Code Project
  1. Home
  2. The Lounge
  3. Crossing the line

Crossing the line

Scheduled Pinned Locked Moved The Lounge
phpvisual-studiocomcollaborationhelp
20 Posts 13 Posters 0 Views 1 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • L leppie

    I am a software developer, and I have a manager. So who is best qualified to manage resources? So this morning I am greeted with a "We need a breakdown of what you did over the last 4 months, and how long each bit took you." Last time I checked it was a manager's (probably more specifically a project manager's) job to track these things. When I get given a task to do, either written or verbal, I just do it, and report my progress (normally verbally), and let them know when the task is completed. Do you really think I need to be the one doing the math on how long it took? The manager should have all that handy in my opinion. I also mentioned that to him and even made a suggestion on how to deal with this better in the future. So, basically I am stuck having to do this, as no one else clearly has any trackable data on tasks performed. I dont mind, I just feel its a waste of time. I thought I would use the SVN log for checkins across my name, but that information posted to Word, is an odd 170 pages! A message to all managers and wannabee managers: You have job, make sure you know what it entail!

    xacc.ide - now with TabsToSpaces support
    IronScheme - 1.0 alpha 4a out now (29 May 2008)

    P Offline
    P Offline
    Paul Watson
    wrote on last edited by
    #10

    How many does this manager manage? What kind of software are you writing? Is it a contracting gig?

    regards, Paul Watson Ireland & South Africa

    Fernando A. Gomez F. wrote:

    At least he achieved immortality for a few years.

    L 1 Reply Last reply
    0
    • L leppie

      I am a software developer, and I have a manager. So who is best qualified to manage resources? So this morning I am greeted with a "We need a breakdown of what you did over the last 4 months, and how long each bit took you." Last time I checked it was a manager's (probably more specifically a project manager's) job to track these things. When I get given a task to do, either written or verbal, I just do it, and report my progress (normally verbally), and let them know when the task is completed. Do you really think I need to be the one doing the math on how long it took? The manager should have all that handy in my opinion. I also mentioned that to him and even made a suggestion on how to deal with this better in the future. So, basically I am stuck having to do this, as no one else clearly has any trackable data on tasks performed. I dont mind, I just feel its a waste of time. I thought I would use the SVN log for checkins across my name, but that information posted to Word, is an odd 170 pages! A message to all managers and wannabee managers: You have job, make sure you know what it entail!

      xacc.ide - now with TabsToSpaces support
      IronScheme - 1.0 alpha 4a out now (29 May 2008)

      R Offline
      R Offline
      Ravi Bhavnani
      wrote on last edited by
      #11

      leppie wrote:

      no one else clearly has any trackable data on tasks performed

      Looks like your manager hasn't managed the project. /ravi

      My new year resolution: 2048 x 1536 Home | Articles | My .NET bits | Freeware ravib(at)ravib(dot)com

      1 Reply Last reply
      0
      • L leppie

        I am a software developer, and I have a manager. So who is best qualified to manage resources? So this morning I am greeted with a "We need a breakdown of what you did over the last 4 months, and how long each bit took you." Last time I checked it was a manager's (probably more specifically a project manager's) job to track these things. When I get given a task to do, either written or verbal, I just do it, and report my progress (normally verbally), and let them know when the task is completed. Do you really think I need to be the one doing the math on how long it took? The manager should have all that handy in my opinion. I also mentioned that to him and even made a suggestion on how to deal with this better in the future. So, basically I am stuck having to do this, as no one else clearly has any trackable data on tasks performed. I dont mind, I just feel its a waste of time. I thought I would use the SVN log for checkins across my name, but that information posted to Word, is an odd 170 pages! A message to all managers and wannabee managers: You have job, make sure you know what it entail!

        xacc.ide - now with TabsToSpaces support
        IronScheme - 1.0 alpha 4a out now (29 May 2008)

        M Offline
        M Offline
        Marc Clifton
        wrote on last edited by
        #12

        leppie wrote:

        but that information posted to Word, is an odd 170 pages!

        Which is the perfect thing to hand to your manager with a little smile "here you go." [edit] In hardcopy, so he has to enter all the dates and times again by hand into his Excel spreadsheet! [/edit] Marc

        Thyme In The Country Interacx My Blog

        P 1 Reply Last reply
        0
        • L leppie

          I eventually broke it down to 4 major tasks and just gave him a days spent breakdown. He said he will see if they accept that (obviously comes from higher up).

          xacc.ide - now with TabsToSpaces support
          IronScheme - 1.0 alpha 4a out now (29 May 2008)

          O Offline
          O Offline
          Obliterator
          wrote on last edited by
          #13

          If they want more send the 170 page report instead :)

          -- The Obliterator

          L 1 Reply Last reply
          0
          • L leppie

            I am a software developer, and I have a manager. So who is best qualified to manage resources? So this morning I am greeted with a "We need a breakdown of what you did over the last 4 months, and how long each bit took you." Last time I checked it was a manager's (probably more specifically a project manager's) job to track these things. When I get given a task to do, either written or verbal, I just do it, and report my progress (normally verbally), and let them know when the task is completed. Do you really think I need to be the one doing the math on how long it took? The manager should have all that handy in my opinion. I also mentioned that to him and even made a suggestion on how to deal with this better in the future. So, basically I am stuck having to do this, as no one else clearly has any trackable data on tasks performed. I dont mind, I just feel its a waste of time. I thought I would use the SVN log for checkins across my name, but that information posted to Word, is an odd 170 pages! A message to all managers and wannabee managers: You have job, make sure you know what it entail!

            xacc.ide - now with TabsToSpaces support
            IronScheme - 1.0 alpha 4a out now (29 May 2008)

            F Offline
            F Offline
            Frank Kerrigan
            wrote on last edited by
            #14

            Yeah he has been asked by a bean counter and doesn't know or can't track it himself. Best problem is someone elses so he's passed it to you. You could look at your code history / sign in dates, emails or just make it up; I suggest a combination of the above.

            DEVELOPER DAY SCOTLAND 10th MAY 2008 http://www.developerdayscotland.com/[^]

            1 Reply Last reply
            0
            • O Obliterator

              If they want more send the 170 page report instead :)

              -- The Obliterator

              L Offline
              L Offline
              leppie
              wrote on last edited by
              #15

              That I will do, them pedantic assholes!

              xacc.ide - now with TabsToSpaces support
              IronScheme - 1.0 alpha 4a out now (29 May 2008)

              1 Reply Last reply
              0
              • P Paul Watson

                How many does this manager manage? What kind of software are you writing? Is it a contracting gig?

                regards, Paul Watson Ireland & South Africa

                Fernando A. Gomez F. wrote:

                At least he achieved immortality for a few years.

                L Offline
                L Offline
                leppie
                wrote on last edited by
                #16

                Directly, just me, and he does the design (architectural) and HTML as well, so not strictly a manager, but he is still my manager! Life is good at the bottom of the food chain ;P

                xacc.ide - now with TabsToSpaces support
                IronScheme - 1.0 alpha 4a out now (29 May 2008)

                P 1 Reply Last reply
                0
                • L leppie

                  Directly, just me, and he does the design (architectural) and HTML as well, so not strictly a manager, but he is still my manager! Life is good at the bottom of the food chain ;P

                  xacc.ide - now with TabsToSpaces support
                  IronScheme - 1.0 alpha 4a out now (29 May 2008)

                  P Offline
                  P Offline
                  Paul Watson
                  wrote on last edited by
                  #17

                  That sounds weird man. My condolences. Anytime I hear "can you update your time from the past 6 months" I use rand and see if they notice. Most of the time, they don't and I don't hear about it until 6 months later when they want more time data. If they do notice I argue until they give up. I'm really stubborn on this issue. But I have a secure position, so I can be a bit stubborn.

                  regards, Paul Watson Ireland & South Africa

                  Fernando A. Gomez F. wrote:

                  At least he achieved immortality for a few years.

                  1 Reply Last reply
                  0
                  • M Marc Clifton

                    leppie wrote:

                    but that information posted to Word, is an odd 170 pages!

                    Which is the perfect thing to hand to your manager with a little smile "here you go." [edit] In hardcopy, so he has to enter all the dates and times again by hand into his Excel spreadsheet! [/edit] Marc

                    Thyme In The Country Interacx My Blog

                    P Offline
                    P Offline
                    Paul Watson
                    wrote on last edited by
                    #18

                    I hate to agree with you. It saddens me but from my experience you can hand them 170 pages of crap or 170 pages of accurate data and it makes no difference. They'll punch it in and not know the difference. The first few times I tried explaining but they didn't care.

                    regards, Paul Watson Ireland & South Africa

                    Fernando A. Gomez F. wrote:

                    At least he achieved immortality for a few years.

                    D 1 Reply Last reply
                    0
                    • P Paul Watson

                      I hate to agree with you. It saddens me but from my experience you can hand them 170 pages of crap or 170 pages of accurate data and it makes no difference. They'll punch it in and not know the difference. The first few times I tried explaining but they didn't care.

                      regards, Paul Watson Ireland & South Africa

                      Fernando A. Gomez F. wrote:

                      At least he achieved immortality for a few years.

                      D Offline
                      D Offline
                      Dan Neely
                      wrote on last edited by
                      #19

                      scrolls vertically in FF 2.0.0.14

                      You know, every time I tried to win a bar-bet about being able to count to 1000 using my fingers I always got punched out when I reached 4.... -- El Corazon

                      P 1 Reply Last reply
                      0
                      • D Dan Neely

                        scrolls vertically in FF 2.0.0.14

                        You know, every time I tried to win a bar-bet about being able to count to 1000 using my fingers I always got punched out when I reached 4.... -- El Corazon

                        P Offline
                        P Offline
                        Paul Watson
                        wrote on last edited by
                        #20

                        Wish I knew why. It is just basic HTML tags that worked until the new version of CP came along.

                        regards, Paul Watson Ireland & South Africa

                        Fernando A. Gomez F. wrote:

                        At least he achieved immortality for a few years.

                        1 Reply Last reply
                        0
                        Reply
                        • Reply as topic
                        Log in to reply
                        • Oldest to Newest
                        • Newest to Oldest
                        • Most Votes


                        • Login

                        • Don't have an account? Register

                        • Login or register to search.
                        • First post
                          Last post
                        0
                        • Categories
                        • Recent
                        • Tags
                        • Popular
                        • World
                        • Users
                        • Groups