Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • World
  • Users
  • Groups
Skins
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse
Code Project
  1. Home
  2. The Lounge
  3. Working hours

Working hours

Scheduled Pinned Locked Moved The Lounge
saleshelpquestion
36 Posts 22 Posters 0 Views 1 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • B Blumen

    We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

    “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

    L Offline
    L Offline
    Lost User
    wrote on last edited by
    #12

    Netherlands; Start @ 8:30, end @ 17:00, 30-minute break included. "Unpaid overtime"? Under no circumstances, ever. I'm not going to make money for someone else without getting anything in return. I ain't a charity :)

    1 Reply Last reply
    0
    • realJSOPR realJSOP

      Then you're not doing your job, or the schedule was unrealistic to begin with.

      "Why don't you tie a kerosene-soaked rag around your ankles so the ants won't climb up and eat your candy ass..." - Dale Earnhardt, 1997
      -----
      "...the staggering layers of obscenity in your statement make it a work of art on so many levels." - Jason Jystad, 10/26/2001

      B Offline
      B Offline
      Blumen
      wrote on last edited by
      #13

      But there is no scale for this, right? Amount of time taken for a work depends on person-person.

      “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

      S 1 Reply Last reply
      0
      • realJSOPR realJSOP

        Then you're not doing your job, or the schedule was unrealistic to begin with.

        "Why don't you tie a kerosene-soaked rag around your ankles so the ants won't climb up and eat your candy ass..." - Dale Earnhardt, 1997
        -----
        "...the staggering layers of obscenity in your statement make it a work of art on so many levels." - Jason Jystad, 10/26/2001

        H Offline
        H Offline
        hairy_hats
        wrote on last edited by
        #14

        Or you have a manager.

        B 1 Reply Last reply
        0
        • B Blumen

          We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

          “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

          E Offline
          E Offline
          eyeseetee
          wrote on last edited by
          #15

          flexi usually work 8-4

          1 Reply Last reply
          0
          • B Blumen

            But there is no scale for this, right? Amount of time taken for a work depends on person-person.

            “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

            S Offline
            S Offline
            Stuart Dootson
            wrote on last edited by
            #16

            Blumen wrote:

            Amount of time taken for a work depends on person-person

            Which is why project estimation systems like COCOMO[^] include parameters to account for things like 'how good/experienced is your team'. You have to take that into account when projecting how long work is likely to take.

            L 1 Reply Last reply
            0
            • H hairy_hats

              Or you have a manager.

              B Offline
              B Offline
              Blumen
              wrote on last edited by
              #17

              they ask me sometimes how long would I take to do this project, and I'm not that experienced to tell them how much times its gonna take.

              “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

              R H L 3 Replies Last reply
              0
              • B Blumen

                We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                N Offline
                N Offline
                Nagy Vilmos
                wrote on last edited by
                #18

                My contracted working week is 35 hours, 9 to 5 with an hour for lunch. Normally, I'm in a little after 8 and I only lunch Thursday & Friday down t'pub. That said, thre is the flexibilty to come late some days or leave early. I don't normally take it because I push to the limit during the summer. When the family are at home in Hungary, I'm normally out at 3 on Friday, to fly over for the weekend and then I fly back Monday morning arriving at work around 11. I was also doing that every week for two years before the family moved over.


                Panic, Chaos, Destruction. My work here is done.

                1 Reply Last reply
                0
                • B Blumen

                  they ask me sometimes how long would I take to do this project, and I'm not that experienced to tell them how much times its gonna take.

                  “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                  R Offline
                  R Offline
                  Rage
                  wrote on last edited by
                  #19

                  That's when you use the "factor 2" rule: make a mere effort estimation and multiply it by two.

                  I'm waiting for Windows Feng Shui, where you have to re-arrange your icons in a manner which best enables your application to run. Richard Jones

                  1 Reply Last reply
                  0
                  • B benjymous

                    We've got flexitime here, so

                    • Earliest start: 8am
                    • Latest start: 10am
                    • Earliest finish: 4pm
                    • Latest finish: 7pm (unless there's overtime)
                    • Lunch can be taken at any time between 12-2 (30 mins to two hours)
                    • You have to do 6 hours in the day
                    • You have to do 37.5 hours in the week
                    • You can carry 2 hours over to the next week (so you can do 35.5 hours, or 39.5 hours)

                    Help me! I'm turning into a grapefruit! Buzzwords!

                    R Offline
                    R Offline
                    Rage
                    wrote on last edited by
                    #20

                    benjymous wrote:

                    6 hours in the day

                    That's _at least_ 6 hours then, otherwise you will have to come on Saturdays (since obviously 5d*6h/d < 37.5).

                    I'm waiting for Windows Feng Shui, where you have to re-arrange your icons in a manner which best enables your application to run. Richard Jones

                    B 1 Reply Last reply
                    0
                    • B Blumen

                      We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                      “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                      D Offline
                      D Offline
                      David Crow
                      wrote on last edited by
                      #21

                      Blumen wrote:

                      So this is gonna be a problem for us.

                      Is it a problem to work one less hour per day?

                      "Love people and use things, not love things and use people." - Unknown

                      "The brick walls are there for a reason...to stop the people who don't want it badly enough." - Randy Pausch

                      B 1 Reply Last reply
                      0
                      • B Blumen

                        We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                        “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                        L Offline
                        L Offline
                        Lost User
                        wrote on last edited by
                        #22

                        Blumen wrote:

                        How is the timings

                        My typical work day is from whenever I get to work until the time I leave to go home.

                        Why is common sense not common? Never argue with an idiot. They will drag you down to their level where they are an expert. Sometimes it takes a lot of work to be lazy Individuality is fine, as long as we do it together - F. Burns

                        1 Reply Last reply
                        0
                        • R Rage

                          benjymous wrote:

                          6 hours in the day

                          That's _at least_ 6 hours then, otherwise you will have to come on Saturdays (since obviously 5d*6h/d < 37.5).

                          I'm waiting for Windows Feng Shui, where you have to re-arrange your icons in a manner which best enables your application to run. Richard Jones

                          B Offline
                          B Offline
                          benjymous
                          wrote on last edited by
                          #23

                          Yeah. It means if you've had a late night you can crawl in at 10, take a half hour lunch, and go home at 4.30, but you need to make up the hours the rest of the week

                          Help me! I'm turning into a grapefruit! Buzzwords!

                          1 Reply Last reply
                          0
                          • S Stuart Dootson

                            Blumen wrote:

                            Amount of time taken for a work depends on person-person

                            Which is why project estimation systems like COCOMO[^] include parameters to account for things like 'how good/experienced is your team'. You have to take that into account when projecting how long work is likely to take.

                            L Offline
                            L Offline
                            Lost User
                            wrote on last edited by
                            #24

                            ..and still you can't trust the system blindly. There are a lot of variables that play along, and not all of them are measured. Common sense cannot be replaced by an algorithm yet. We would have replaced congress if it were that easy :)

                            S 1 Reply Last reply
                            0
                            • B Blumen

                              they ask me sometimes how long would I take to do this project, and I'm not that experienced to tell them how much times its gonna take.

                              “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                              L Offline
                              L Offline
                              Lost User
                              wrote on last edited by
                              #25

                              Whenever an estimate is required, I tend to postpone the answer until I have completely specced out what should be created. That means that one builds a functional specification before answering. Without a list of things to do, every answer would be a wild guess. With the todolist, it's still a guess, but an educated one. Planning the implementation of a project is one of the most difficult tasks that a developer has, IMHO.

                              1 Reply Last reply
                              0
                              • B Blumen

                                they ask me sometimes how long would I take to do this project, and I'm not that experienced to tell them how much times its gonna take.

                                “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                                H Offline
                                H Offline
                                hairy_hats
                                wrote on last edited by
                                #26

                                Get a 12-sided D&D die, roll it, and tell them that many months.

                                1 Reply Last reply
                                0
                                • L Lost User

                                  ..and still you can't trust the system blindly. There are a lot of variables that play along, and not all of them are measured. Common sense cannot be replaced by an algorithm yet. We would have replaced congress if it were that easy :)

                                  S Offline
                                  S Offline
                                  Stuart Dootson
                                  wrote on last edited by
                                  #27

                                  eddyvluggen wrote:

                                  Common sense

                                  eddyvluggen wrote:

                                  congress

                                  Hmmmm - common sense and politicians...what do they have to do with each other? ;P

                                  1 Reply Last reply
                                  0
                                  • B Blumen

                                    We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                                    “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                                    G Offline
                                    G Offline
                                    Gary Wheeler
                                    wrote on last edited by
                                    #28

                                    6:30 a.m. to 5:00 p.m. for the days I go for a run at lunchtime. 6:30 a.m. to 3:30 p.m. for the days I go to the gym after work. Overtime is extremely rare. I haven't put in over 50 hours in a week in years. If you notice that my schedule is dictated by my needs, rather than my employer's wishes, you're catching on.

                                    Software Zen: delete this;

                                    1 Reply Last reply
                                    0
                                    • B Blumen

                                      We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                                      “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                                      P Offline
                                      P Offline
                                      PIEBALDconsult
                                      wrote on last edited by
                                      #29

                                      Software development is a thinking activity; you don't need to be any particular place to do it. In fact, sitting at a desk in front of a blank screen often inhibits the process. I've always been able to set my own hours (as long as I was there at least eight hours a day). I prefer to work early; it helps beat the traffic and eases bathroom congestion at home. And on one job I worked on the west coast I had to support people on the east coast so it made sense for my day to match theirs. Currently, I'm working from home, so I really have no schedule.

                                      1 Reply Last reply
                                      0
                                      • B Blumen

                                        We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                                        “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                                        J Offline
                                        J Offline
                                        Joe Woodbury
                                        wrote on last edited by
                                        #30

                                        Roughly 9-5. Sometimes come in later and leave earlier, sometimes leave late. (Rarely come in earlier due to traffic patterns, especially in winter.) I'm on salary, which means I'm paid to do a job, not punch a clock. (Generally, if you fix hours, you turn an employee into a wage employee and must start paying overtime. Unfortunately, management often abuses that [until they get sued.])

                                        Anyone who thinks he has a better idea of what's good for people than people do is a swine. - P.J. O'Rourke

                                        1 Reply Last reply
                                        0
                                        • B Blumen

                                          We got a mail from management asking our vote on revised working hours. Options are: Option 1 7.30 a.m. to 4.30 p.m. Option 2 8.00 a.m. to 5.00 p.m. Option 3 8.30 a.m. to 5.30 p.m. Option 4 9.00 a.m. to 6.00 p.m. Current timings are 8:00 AM - 6:00 PM I'm from middle east (Oman). We developers never get to leave on time in the evening and people in other department (Sales, marketting, support, admin, etc) leave on time. So this is gonna be a problem for us. How is the timings on other countries for software professionals? Manu

                                          “The thing for you is a burial permit. You have only to speak and I will see that you get it.”

                                          L Offline
                                          L Offline
                                          Le centriste
                                          wrote on last edited by
                                          #31

                                          As a consultant, I decide what my work hours will be, usually depending on the time I get up in the morning. Since I don't use an alarm clock, it varies from day to day. At the end of the month, I bill my client an insane amount of money, depending on how much hours I have worked in the month.

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Don't have an account? Register

                                          • Login or register to search.
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Recent
                                          • Tags
                                          • Popular
                                          • World
                                          • Users
                                          • Groups